Controls Testing

Prove every control works,
with agents testing the full population

Agents test every item, log every exception and raise each issue with a named owner

Request a demo →
Zango Controls Testing: a quarter's testing plan with design and operating results for each control

Trusted by leading financial institutions

Sample testing leaves most of the population unseen
agents test design and operating effectiveness in full

Which controls are due for testing?

Agents build the testing plan with the frequency, tester and reviewer for each control.

Does each control operate effectively?

Agents test every item in scope and log each exception against the control, with the reasoning beside the conclusion.

Which exceptions are deficiencies?

Testers set the conclusion, and each deficiency raises an issue and an action with an accountable owner.

Who attests to each control?

Control owners attest with evidence, business controllers review, and attestations escalate to the executive and risk committee.

Q3 2026 testing plan, with one control's frequency, method, tester and reviewer drafted by the planning agent
A control's test result: design effective, operating partially effective, with 31 exceptions across 1,240 items tested
Exceptions list classifying each finding, with 29 of 31 exceptions traced to one control deficiency
Attestations for the quarter, with a control owner attesting that a control operated as described
Lara Reis
Lara Reis
Head of Regulatory Affairs @ novobanco
“We are thrilled with how Zango has transformed our compliance processes, saving us hundreds of hours of manual repetitive work and allowing our team to focus on strategic initiatives.”
7x
ROI by replacing consultants
70–80%
Time saved on gap analysis
Every item
Tested across the full population, not a sample

Inside Controls Testing

Follow controls from the testing plan to the assurance report: full-population testing, exceptions logged, issues owned and attestations signed off.

Q3 2026 testing plan listing each control with its frequency, tester and reviewer, and one control flagged as having no tester

One testing plan across the control environment

Each control carries its frequency, tester and reviewer, so gaps in testing coverage are visible before testing starts.

Operating effectiveness for a control: 1,240 items tested and 31 exceptions, with each exception listed

Full-population testing, every exception logged

Every item is tested and every exception is recorded against the control, with the reasoning beside the conclusion.

An issue raised from testing, with its progress from raised to closed, the control it came from and the owned action in progress

Issues raised, actions owned to closure

A partially effective or failed control raises an issue and an action with an accountable owner, tracked until it closes.

Sub-certification progress from control owners to the business controller, the executive and the board risk committee

Sub-certification from owner to executive

Control owners attest with evidence, business controllers review, and attestations escalate to the executive and the risk committee.

Assurance report built from the audit trail, showing controls tested, attested and open issues

Assurance reporting that stands up to audit

Every attestation, return and reminder is recorded with who and when, and the assurance report is generated from the same record.

Assurance, kept current

Every item tested, every exception owned

Day 0
Planning agent opens the testing plan
20 controls scoped: 12 automated, 8 tester-led
Testers assigned across the full population
Day 2
Testing agent tests all 1,240 claims on CTR-108
31 exceptions linked to their claim records
Second line tester records the conclusion
Day 3
Reporting agent raises the issue
Owner assigned, action due 31 Oct 2026
Attestation pack drafted from the same record
Sign-off
Control owners attest with evidence
Business controller reviews all 20 controls
Chief Operations Officer signs off the results
Committee pack sent for the 14 Oct meeting
Assurance, kept current

Every item tested, every exception owned

Day 0

Agent flags the amendment and scopes it to your licences.

✦Monitoring agent Flags the amendment and scopes it to your licences.
New amendment
PRA finalises Pillar 2A review, phase 1 (PS15/26)
PRA  •  High impact  •  1 licence affected
SoP 5/15 The PRA’s methodologies for setting Pillar 2 capital
Amended Regulation
Day 2

Agent extracts the obligations. An expert verifies each one.

✦Extraction agent Extracts the obligations. An expert verifies each one.
Obligations extracted
32 obligations, each cited to its source clause
24 new  •  8 amended
OBL-PRA-212
Hold Pillar 2A capital under the updated methodology
New
OBL-PRA-213
Apply the revised credit concentration risk approach
New
OBL-PRA-207
Recalculate the operational risk add-on
Amended
OBL-PRA-214
Update the ICAAP to reflect the Pillar 2A changes
New
OBL-PRA-209
Report Pillar 2A data in the revised templates
Amended
OBL-PRA-215
Reassess pension obligation risk under the new approach
New
26 more
Verified by Regulatory expert
Verified
Day 3

Agent maps each obligation to your policies and controls, and flags the gaps.

✦Mapping agent Maps each obligation to your policies and controls, and flags the gaps.
Gap analysis ready
Obligations mapped to your policies and controls
1 gap  •  1 partial  •  4 adequate
Capital Adequacy Policy, section 3.2
Gap
ICAAP control CTL-044, quarterly add-on review
Partial
Sign-off

Your team reviews, remediates and approves. The decision stays with you.

✦Your team reviews, remediates and approves. The decision stays with you.
Awaiting approval
Gap analysis ready for sign-off
2 owners assigned  •  Evidence requested
Approve
Request changes
PO
HC
Day 0

Agent opens the testing plan with every control in scope.

Planning agent

Opens the testing plan with every control in scope.

✦Planning agent Opens the testing plan with every control in scope.
Testing plan
Q3 2026 assurance: 20 controls in scope
Testers assigned • Full population • Due 30 Sep 2026
CTR-108 Vulnerability identification at claim intake Tester-led · Second line tester · monthly
In scope
CTR-104 APP reimbursement SLA monitoring Automated · daily
In scope
CTR-101 Fraud detection scoring Automated · daily
In scope
20 controls · 12 automated · 8 tester-led
Day 2

Agents test every item. A tester records the conclusion.

Testing agent + Second line tester

Agents test every item. A tester records the conclusion.

✦Testing agent Agents test every item. A tester records the conclusion.
Full population tested
CTR-108: 1,240 claims tested, 31 exceptions
Evidence attached • Conclusion recorded
1,209 claims passed Vulnerability outcome recorded at intake
Passed
Outcome not recorded on 31 of 1,240 claims Each exception linked to its claim record
Exception
Design and operating effectiveness Tester conclusion for Q3
Partial
Concluded by Second line tester
Day 3

Agent raises the issue and prepares the attestation pack.

Reporting agent

Raises the issue and prepares the attestation pack.

✦Reporting agent Raises the issue and prepares the attestation pack.
Issue raised
Assessment outcome not recorded at claim intake
1 issue • 1 action • Owner assigned
Action: record the outcome on every claim Owner: Claims operations manager · due 31 Oct 2026
Open
Q3 attestations: 15 of 20 attested Reminders sent to 5 control owners
Outstanding
Attestation pack drafted from the same record
Sign-off

Owners attest and the executive signs off. The decision stays with you.

Your team

Owners attest and the executive signs off. The decision stays with you.

✦Owners attest and the executive signs off. The decision stays with you.
Awaiting attestation
Q3 2026 sub-certification ready for sign-off
4 levels • Audit trail complete
1 · Control owners 20 of 20 attested with evidence
Attested
2 · Business controller 20 reviewed · 1 returned and resolved
Reviewed
3 · Chief Operations Officer Sign-off for Q3
Awaiting approval
4 · Executive Risk Committee Q3 certification
Pending
Approve
Request changes
OW
OO
Q3 2026 sub-certification signed off by Chief Operations Officer
Signed off
Q3 2026 assurance report generated from the same record as the tests
Ready
Executive Risk Committee pack sent for the 14 Oct meeting
Sent

Built for regulated financial services firms

Request a demo →

SOC 2

Security controls independently audited against the AICPA trust criteria.

ISO 27001

Certified to the international standard for information security management.

GDPR

Personal data processed in line with UK and EU GDPR.

Encryption
Data is encrypted in transit and at rest
Access control
Single sign-on and role-based permissions.
Audit trail
Every change recorded who, what and when.

Agents do the groundwork.
Your experts keep the judgement.

Every decision, sign-off and accountability stays with your team, on the record.

Speak to an expert
Research and insight

Shaping how financial services adopts AI

Printed copies of the future of AI governance and compliance in financial services research report
Research report

The future of AI governance and compliance in financial services

Interviews with 27 senior risk, compliance and AI governance leaders, advised by the University of Glasgow and Oxford Martin School.

Read the report →
Speaker at the Madrid Regulatory Forum hosted with IE University
Event

Madrid Regulatory Forum

The ECB, Banco de España and Spain's leading banks on governing AI at scale. Hosted with IE University.

Read the recap →

Zango's Controls Testing FAQs

Talk to us →

Controls testing software plans, runs and records tests of your controls and carries the results through to sign-off. Zango tests design and operating effectiveness on every item in scope, records each exception against its control and runs quarterly sub-certification on the same record, so assurance is evidenced end to end.

Zango Controls Testing tests the design and operating effectiveness of each control in your library. Exceptions are recorded against the control with the reasoning beside the conclusion, and a conclusion is set for each testing period, so coverage and results are visible across the whole control environment.

How do AI agents support controls testing?

Zango's agents build the testing plan, run the automated tests, log every result and raise issues for failed controls. Testers record the conclusion and control owners attest, so the judgement stays with your team while the repetitive work is automated.

Tests run against the controls in your Zango Control Library, so each result stays with the control, its owner and its history. Operating effectiveness results flow back to the library automatically, keeping one record of design, testing and conclusions.

Each quarter, control owners attest with evidence, business controllers review, and attestations escalate to the executive and the risk committee. In Zango, items can be returned to the owner for remediation, and every attestation, return and reminder is recorded.

Zango records the conclusion and raises an issue with an action and an accountable owner. Both stay open and visible until they close, and any risk assessments that depend on the control are flagged for review.

Around 60% of controls can be tested automatically with Zango, so testers spend their time on complex controls that need judgement. Automated and manual tests sit on the same testing plan, with results and evidence recorded in one place.

Yes. Every test, attestation, return and reminder sits in Zango's audit trail with who and when, and the assurance report is generated from the same record, so auditors can follow each conclusion back to its evidence.

Zango generates the assurance report for each period from the same record as the tests, exceptions and attestations. Nothing is rebuilt by hand, and every figure in the report traces back to the underlying evidence.

Yes. Zango is SOC 2 audited and ISO 27001 certified, processes personal data in line with UK and EU GDPR, encrypts data in transit and at rest, and supports single sign-on with role-based permissions. Every change is recorded with who, what and when.